Skyroot Aerospace

Skyroot Aerospace is an Indian private launch company based in Hyderabad, founded in 2018 by two former ISRO engineers, that became the first Indian firm to put a rocket into orbit from Indian soil. Its four-stage Vikram-1 vehicle reached low Earth orbit on its maiden flight on 18 July 2026, carrying customer payloads, and the company has since become India’s first space-technology unicorn.[1][2] 

Origins

Skyroot was started in 2018 by Pawan Kumar Chandana and Naga Bharath Daka, both IIT graduates who had worked at ISRO; between them they had been involved in the commercial production of the LVM3 heavy-lift vehicle. Their pitch was straightforward: small satellites were getting cheaper and more numerous, but the world lacked dedicated, affordable rides to orbit for them. What made the project feasible was institutional access: ISRO opened its solid-motor casting and static-test facilities at Sriharikota to the company, and IN-SPACe, the regulator created under the 2020 reforms, shepherded the approvals.[3][4] 

None of it would have been possible without the 2020 space-sector reforms that opened Indian space activity to private industry, ending ISRO’s monopoly on building and launching rockets and creating IN-SPACe as the regulator and promoter. Skyroot was among the first companies to work through that new framework.[5] 

Vikram-S and the suborbital proof

The company’s first flight was not an orbital rocket but a suborbital one. Vikram-S, a single-stage solid-propellant vehicle named for Vikram Sarabhai, lifted off from Sriharikota on 18 November 2022 and reached space, making Skyroot the first private Indian company to do so and demonstrating that the team could build, integrate and fly a rocket end to end.[6][7] 

Vikram-1 and Mission Aagaman

Vikram-1 is a four-stage small-satellite launcher: three solid stages followed by a liquid “orbital adjustment module” that performs the final push to orbital velocity and then hosts experiments. It stands about 22 m tall, can place up to 350 kg in low Earth orbit, and is built around technologies Skyroot developed in-house — an all-carbon-composite structure including one of the country’s longest monolithic composite stages, a fully 3D-printed liquid engine, and ultra-low-shock pneumatic separation systems.[8] 

Mission Aagaman — Sanskrit for “arrival” — lifted off from the Satish Dhawan Space Centre at 12:05:30 IST on 18 July 2026 after a short hold to resolve a ground software issue, and reached a roughly 450 km orbit at 60° inclination minutes later. Two satellites, SCOPE and Grahaa, were deployed; the upper stage carried further experiments, including a technology demonstration from German startup Dcubed and a robotic arm for orbital debris work built by Indian startup Cosmoserve. The flight validated the composite structures, the solid stages and the 3D-printed engine, and made India the third country, after the United States and China, with a private company capable of reaching orbit.[9][10] 

The harder achievement was not reaching orbit once but making it routine: a rocket that flies on the first attempt still has to be built, tested and shipped again within months to be a business rather than an event.

What went right, and what did not

The flight was not flawless, and Skyroot has been unusually candid about the rough edges. Telemetry was lost for about two minutes during third-stage flight when a ground station failed to track the vehicle, briefly convincing the team in mission control that the rocket was falling; the fault was traced to ground systems, not the launch vehicle. Camera views during third-to-fourth stage separation also suggested the spent stage stayed unusually close, which the company says data later ruled out as a collision but is still analysing. Chandana has described the actual trajectory as a near-perfect match to prediction.[11] 

Becoming a unicorn

In May 2026, seven weeks before the launch, Skyroot raised about $60 million at a pre-money valuation of $1.1 billion, becoming India’s first space-technology unicorn and more than doubling its valuation in about two and a half years. The round was co-led by Sherpalo Ventures — whose founder Ram Shriram joined the board — and Singapore’s GIC, with BlackRock-managed funds, Playbook Partners, the Shanghvi family office and existing investors including Arkam Ventures and the founders of Greenko Group. Total capital raised stands at about $160 million.[12][13] 

After the launch the market moved again. Reports in August and October 2026 described a much larger round being discussed at valuations of $2 billion and above, with the company taking the unusual step of asking investors to bid rather than pitching them. None of that has been confirmed by the company, and the terms have been reported as still evolving.[14][15] 

Manufacturing and cadence

The business case rests on launch frequency, and Skyroot has been building for it. The first Vikram-1 was manufactured and shipped from Max-Q, its headquarters facility near the Rajiv Gandhi International Airport at Shamshabad. The second is being built at the Infinity Campus, a 2 lakh sq ft facility inaugurated by Prime Minister Narendra Modi in November 2025 and designed to eventually support a cadence of one rocket a month.[16] 

Production did not wait for the first flight to succeed. The company had begun work on the second rocket while the first was still being readied at Sriharikota, and the first-stage hardware of the second vehicle was flagged off to the spaceport towards the end of August 2026 — 36 days after the maiden launch. The full vehicle was to be shipped by the end of November, with a second test flight expected in December or early January, and fully commercial missions from the third flight onwards.[17] 

What comes next

The next vehicle is Vikram-2, a one-tonne-class launcher powered by an advanced cryogenic stage, intended to widen the range of missions and customers the company can serve and expected to debut around 2027. Beyond that, Skyroot has spoken of reusable vehicles — a much larger rocket several years away. The immediate test is narrower and harder: convert a single flawless debut into a dependable schedule, because a launch company is judged on the flights it completes, not the one that made history.[18][19] 

Report Image

Please specify the reason for reporting this image (e.g. copyright violation, inappropriate content).

Image Details & Licensing

Media Preview
Author:
Source:
License:
Uploaded By:
File Type:
View Original

Article Revision History

Please Login to join the discussion.